EAST AVENUE WELFARE SOCIETY OCT 2019

 

Balance As on 31-10-2019

Amount

 

Opening Balance

649,497.60

 

Total Income from Recharge

694,300.00

 

Contigency

8,500.00

 

Extra Income

20,500.00

 

Total Income

1,372,797.60

 

Total Expense

943,894.80

 

Balance Forward

428,902.80

 

 

 

DATE

PARTICULARS EXPENSES

AMOUNT

10/1/2019

TILES LABOUR CHARGE

1,000.00

10/1/2019

RWA OFFICE STAFF TEA EXP.SEPT

632.00

10/1/2019

CEMENT 5 BAG+ FARE

1,750.00

10/1/2019

TREE CUTTING

250.00

10/1/2019

STAMP

50.00

10/1/2019

DESHI GHEE

600.00

10/1/2019

PLUMBING ITEM G BLOCK

810.00

10/1/2019

TILES PICK UP FRIGHT MAIN GALI

350.00

10/2/2019

CEMENT 5 BAG

1,750.00

10/2/2019

MANDIR POOJA MATERIAL(F 106)

850.00

10/2/2019

YAMUNA SAND 20FIT

500.00

10/2/2019

STONE CHIPES C BLOCK 20 FIT

900.00

10/2/2019

6 INCH PVC PIPE C BLOCK

200.00

10/2/2019

DOCTOR FIXED 250GRM

200.00

10/2/2019

C BLOCK HILTI RENT ONE DAY

500.00

10/2/2019

25 METER WAIR

400.00

10/2/2019

C BLOCK SEVER LINE DISMENTER

500.00

10/3/2019

IMTIAZ (C BLOCK SEVER LINE)

1,000.00

10/3/2019

CUTTER BLADE 4 PICS

100.00

10/3/2019

SOCKET 8 INCH C BLOCK SEVER LINE

390.00

10/3/2019

BIKE PETROAL

150.00

10/3/2019

HELTI MACHINE RENT 2 DAY

500.00

10/3/2019

TILES LE AANE KAA RENT ( MEAIN GALI)

350.00

10/3/2019

COLD DRINK BISKUT

100.00

10/4/2019

ELECTRICAL ITEM

425.00

10/4/2019

RATHI STEEL 8MM C BLOCK 8.800KG

380.00

10/4/2019

CEMENT 5 BAG + RENT

1,750.00

10/4/2019

TAR 250 GRM

60.00

10/4/2019

CUTTER BLADE 4 PICS

100.00

10/4/2019

BIKE PRTROAL (HOSHIARPUR)

100.00

10/4/2019

OFFICE WASH ROOM PULUMBING ITM

1,200.00

10/5/2019

ELECTRICAL ITEM CLIP 6POCKET

530.00

10/5/2019

CEMENT 5 BAG MAIN GALI TILES

1,750.00

10/5/2019

C BLOCK SEVAR LINE KAA MALBAA

200.00

10/6/2019

MANDIR POOJA MATERIAL(F 106)

805.00

10/6/2019

PULUMBING ITEM

190.00

10/6/2019

ELECTRICAL ITEM

135.00

10/6/2019

RAHMAT LABAR CHARGE (tile job) main gali

2,000.00

10/6/2019

BILL MISS

325.00

10/7/2019

PULMBING ITEM + RENT

1,450.00

10/7/2019

IMTIAZ (C BLOCK SEVER LINE)

1,500.00

10/7/2019

COLD DRINK BISKUT

115.00

10/8/2019

SEVER CLEAN G BLOCK

200.00

10/8/2019

MOTOR RENMOVAL

600.00

10/8/2019

PULMBING ITEM

616.00

10/9/2019

CEMENT 5 BAG

1,750.00

10/10/2019

DIESEL + RENT

4,432.00

10/10/2019

PETROL

100.00

10/10/2019

ELECTRICAL BILL

572,130.80

10/10/2019

WATER BILL FOR SEP. MONTH

1,755.00

10/10/2019

GAS REFILL GATE GUARD

200.00

10/11/2019

NIL

-

10/12/2019

WAIR + TAI

1,000.00

10/12/2019

BIKE PETROAL

150.00

10/12/2019

consolidated charge for a/c

10.00

10/13/2019

DOR ELBOO

180.00

10/14/2019

M SEL 500GM

140.00

10/14/2019

PETROL

50.00

10/14/2019

RWA METTING JUNARL

364.00

10/14/2019

SHAHRUKH KHAN SK FERVACTION

11,500.00

10/14/2019

NANDAN DG REPAIR

800.00

10/15/2019

ELECTRICAL ITEM FOR COMMON AREA

1,090.00

10/16/2019

PRINTER REPAIR (NEERAJ)

400.00

10/17/2019

10 kg BLECHAING POWDER

460.00

10/17/2019

3 PIC ROOM PACHNER

300.00

10/18/2019

MOTOR RENMOVAL C BLOCK

600.00

10/18/2019

MOTOR RENT AUTO C BLOCK

350.00

10/18/2019

SALARY FLOWER MANDIR

800.00

10/19/2019

1 BAG CEMENT RENT

350.00

10/20/2019

NIL

-

10/22/2019

USB2.0 ACTIVE EXTENSION CABLE 10. METER WAIRE (CAMERA)

700.00

10/22/2019

NIGHT GUARD MIL

700.00

10/22/2019

MOTOR REMOVAL & INSTALLTION

600.00

10/23/2019

PAID TO MANOJ LIFT BY CHEQE (246792)

20,000.00

10/23/2019

YOUGESH KUMAR BY CHEQE (246793) SALARY TO SEP.

6,000.00

10/23/2019

PAID TO SECURE METER AMC CHARGE BY CHEQE (246790)

42,000.00

10/24/2019

NILL

-

10/25/2019

PAID TO RAHMAT (LABER CHARGE)

5,000.00

10/25/2019

PANDIT JI SALARY

5,000.00

10/25/2019

CEMENT 1 BAG RENT

350.00

10/25/2019

MCL & UNION E BLOCK

260.00

10/26/2019

BLINKING LIGHT

1,250.00

10/26/2019

STARTER C BLOCK + RENT

2,260.00

10/26/2019

DIESEL + RENT

2,000.00

10/27/2019

MOTOR REMOVAL & INSTALLTION C BLOCK 2 TIME

1,200.00

10/27/2019

CAMBAL & SWEET DIWALI ME

11,000.00

10/27/2019

MOTOR TAMPU CHARGE SECTOR 10

350.00

10/27/2019

CHUNA FOR WELL PAINT SECURITY GATE WITH LABER CHARGE

800.00

10/28/2019

DIYA

900.00

10/28/2019

OIL 4LTR

500.00

10/29/2019

CHUNA FOR DRESSING FOR DIWALI

250.00

10/30/2019

MOTOR REMOVAL & INSTALLTION A 1 BLOCK

600.00

 

FACILITY MANAGEMENT CHARGE INCLUDING SECURITY &

 

10/31/2019

ACCOUNTING FOR THE MONTH OF OCT

154,000.00

10/31/2019

DGP SECURITY SERVICE

61,000.00

 

TOTAL

943,894.80

WE HAVE PAID EXTRA ELECTRICAL BILL FOR THE MONTH OF SEPT. TO OCT. MONTH DUE TO GOVT.ELECTRICITY BILL UNIT RATE

NOTE INCREMENT RS 150000 (LUMPSUM)

-427,689.79

2808

1100